Date
Team Name
Location
Work Order Code
System Connectivity Type
Client Address
Smart Ready
DBB Sharing Ready
DBB BOX Code
DBB Shared BEP Code
FDC Code
FDC Address/Location
0 selected
1.) Pathway & Protection - (Installed)
2.) Termination & Distribution - (Installed)
Building Entry Point (terminal box)
Building Main Optical (terminal box)
Other Distribution Terminal Box
3.) Cable & Connector Connectivity - (Installed)
4-Core Pigtails (F4)
8-Core Pigtails (F8)
Other Connectors & Patchcords
4.) Microducting Connectivity System
5.) Passive Equipment - (Installed)
6.) Civil Works - (Meters)
Pending Tasks
š Note: